Place corner pieces where panels will meet bends at the edge of the roofing.
Metal roof assembly details.
Tremco roofing offers the industry s most comprehensive roofing and weatherproofing solutions for restoration repair maintenance replacement and new construction.
Standing seam panels offer sleek lines that create a modern look.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per.
Sign up now to get the latest metal roofing and metal architectural product news 6 times a year.
Trans lucent panels should be cleaned and sealed regularly as recom mended by the translucent panel manufacturer.
Purlins girts and roof deck the substructure to which the metal panels are fastened must.
2x4 woods studs 24 oc on separate plate no minimum spacing between rows joints finished 3 1 2 glass fiber insulation.
On 2 x 6 common plate joints finished optional veneer plaster 5 8 sheetrockfirecodecore gypsum panels ul des u341 a 71.
Corrosion of the metal panels below.
Pac tite coping welded endcap assembly post finished.
There are four basic standing seam metal roof panel styles.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
If used on roofs apply butyl caulking to separate the fiberglass panels from the metal.
Wti weatherproofing technologies inc a subsidiary of tremco incorporated provides roofing services construction management and general contracting.
Mbci manufactures quality standing seam metal roofing panels that are lightweight and last up to 60 years.
Eave detail w gutter 1.
Gypsum panels 2 x 4 staggered wood stud 24 o c.
We respect your privacy and will not use your email address for other purposes.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.